Concrete CalculationProfessional

Concrete Volume Pro Calculator

Calculate accurate concrete volumes in cubic yards, estimate material requirements, and generate professional quotes for contractors with waste factor and cost analysis.

Project Configuration
Select shape and enter dimensions
Cost & Material Factors
Configure waste, bag size, and pricing

Typical: 5-15%

Ready-mix delivery

Volume Calculation
Calculate cubic yards for slabs, footings, columns, and sono tubes with automatic unit conversion.
Material Estimation
Estimate bags needed (60 lb or 80 lb), total weight, and compare bagged vs ready-mix options.
Cost Analysis
Generate accurate material cost estimates with waste factor for professional client quoting.
How the Concrete Volume Pro Calculator Works
1

Select Project Shape & Enter Dimensions

Choose slab, footing, column, or sono tube, then input measurements in feet and inches as indicated for each field.

2

Configure Waste & Cost Factors

Set waste factor (5-15% typical), select bag weight (60 or 80 lb), and enter local ready-mix price per cubic yard.

3

Review Professional Estimates

See cubic feet, cubic yards, order volume with waste, bags required, total weight, and material cost instantly.

4

Use Recommendations for Planning

Follow professional recommendations for bag vs ready-mix decisions, crew requirements, and code compliance considerations.

Example Concrete Volume Calculations

Scenario 1: Residential Garage Slab

Shape: Slab
Dimensions: 20' × 20' × 4"
Waste Factor: 10%
Price per Yard: $150

Results: 133.33 cubic feet = 4.94 cubic yards. With 10% waste = 5.43 yards to order. Cost: $815. Recommendation: Ready-mix delivery suitable, requires 2-3 person crew.

Scenario 2: Deck Footings (Multiple Columns)

Shape: Sono Tube (8 columns)
Each Column: 12" diameter × 4' deep
Total Volume: 0.93 yards
Bags Needed: 46 × 80lb bags

Results: Each tube = 3.14 ft³. 8 tubes = 25.1 ft³ = 0.93 yards. With 10% waste, need 46 bags. Recommendation: Use bagged concrete for flexibility in timing between pours.

Scenario 3: Commercial Driveway Apron

Shape: Slab
Dimensions: 30' × 12' × 6"
Waste Factor: 12%
Price per Yard: $165 (4000 PSI)

Results: 180 cubic feet = 6.67 cubic yards. With 12% waste = 7.47 yards. Cost: $1,233. Recommendation: Heavy-duty mix for commercial traffic, requires 3-4 person crew and bull float equipment.

Frequently Asked Questions

External References & Resources

Related Calculators

Building Material Cost Estimator
Calculate comprehensive construction costs for client quotes
Use Calculator
Concrete Driveway Cost Calculator
Estimate driveway concrete costs and installation
Use Calculator
Stone Calculator
Calculate stone and aggregate materials for landscaping
Use Calculator
Share This Calculator
Help others discover this useful tool